IGDecenal. Construction insurance

Decennial insurance and OCT documentation

An organised application.
From the first document.

This guide helps you identify the initial information needed. Specific requirements depend on your build’s characteristics and stage.

Start with what you have.

This is not a definitive underwriting checklist. You can start an enquiry and explain what information is available and which documents are pending.

01 / INITIAL DETAILS

Developer and development

Contact details, location, building use, number of homes and construction stage.

02 / PROJECT

Project documentation

Available design or construction plans and drawings. Identify the current project version.

03 / TECHNICAL INFORMATION

Ground investigation and structure

Ground investigation report and foundation and structural information, according to the application requirements.

04 / TECHNICAL CONTROL

Technical control documentation

Details of the technical control body and available reports, including the D0 report where applicable.

Still missing some documents?

Start by telling us about your build. In the initial enquiry, describe what you have; the documents are organised at the next stage.

Discuss my project